PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Compacting underground Storm piping Facing North (800x600).jpg Continued installing temporary stairs and platforms Facing South (800x600).jpg Continued installing the shear wall panels at Elev. 5,6 (3rd Floor) Facing West (800x600).jpg Installing rebar mats at Elev. 1,2,3 (3rd Floor) Facing East (800x600).jpg Installing rebar mats at Elev. 1,2,3 (3rd Floor) Facing South-West (800x600).jpg Performing water test at water service pipes Facing West (800x600).jpg Roughing underground sanitary piping under adult cells Facing West (800x600).jpg Welding extension beams at Derrick -3 (2nd Floor) Facing East (800x600).jpg Welding the metal decking at Derrick -3 (3rd Floor) from Column line H-M to 4-6 Facing North (800x600).jpg
Previous pageNext page Installing rebar mats at Elev. 1,2,3 (3rd Floor) Facing South-West (800x600)
Installing rebar mats at Elev. 1,2,3 (3rd Floor) Facing South-West (800x600)